The I-95 northbound Rappahannock River Crossing project seeks to reduce northbound I-95 congestion between the Exit 130/Route 3 interchange in Fredericksburg and the Exit 133/Route 17 interchange in Stafford County. Most of the project’s features will be built between Exit 130 and Exit 133.
The I-95 Northbound Rappahannock River Crossing project seeks to reduce I-95 northbound congestion at Fredericksburg by providing local traffic with an additional route to travel between the Route 3 and Route 17 interchanges without merging into the interstate's general purpose lanes.
The link will take you to an online meeting room with narrated display boards with design details, a construction schedule, and simulation videos for the project. The virtual public information center will be live for the entirety of this project.
https://virtualmeetings.jmt.com/RRCProjectsPIC
MEETING MATERIALS
MODIFICATION REPORT (IMR)
ENVIRONMENTAL
Study Documents
Technical Reports
A Citizen Information Meeting was held on this project on Wednesday, January 30, 2019 at James Monroe High School in Fredericksburg. The documents shared at the meeting are included below:
Last updated: April 30, 2024